Scope:
Extend the Gold Canyon Road across the east side of Bulverde Road adjacent to the southern property line of the District-owned Roseheart Elementary School site. The roadway extension consists of 1,335 linear feet of roadway and will be the primary access to the future elementary school.
Planning Estimate 1:
$ 1,950,000
Start Date:
May 2010
End Date:
October 31, 2010
Photo Gallery:
Aerial Photos
Engineer:
Pape-Dawson Engineers Inc
Mechanical, Electrical, & Plumbing Engineering
General Contractor:
V.K. Knowlton Construction & Utilities, Inc.
Project Summary:
Bid Award (PDF)
Bid Tab (PDF)
Roseheart Road Extension Project Summary(PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.