Scope:
This project will provide for the following: (1) construction of a new clinic (~637 sq. ft.), (2) conversion of the existing clinic into administrative office space and relocation /construction of the principal’s office to improve the overall function and layout of the campus administrative area, (3) expansion (~1,128 sq. ft.) and renovation of the existing kitchen facility including a new equipment package and (4) selective exterior/interior wall demolition and reconstruction at four school entrances to alleviate moisture/drainage concerns.
Planning Estimate1:
$ 1,095,000
Start Date:
January 15, 2006
End Date:
October 31, 2006
Photo Gallery:
General Contractor:
Baron-Long Construction, Ltd.

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.