2007 Bond Project: El Dorado ES
Classroom Addition


Project Completed
Project Details
Scope:
The design provides for construction of: (1) eighteen general instructional classrooms with integrated restrooms, (2) two pull-out classrooms supporting music and a computer lab, (3) new gym(+) with PE support facilities, (4) teacher support areas including two grade level workrooms, one conference room, and one book storage room, (5) new teacher dining area with integrated restrooms allowing the main campus workroom to be relocated from the stage area to the existing teacher dining area (in the main academic building) better servicing school operations, (6) new clinic addition, (7) new bus loop, fire lane extension and campus parking expansion, (8) outdoor pavilion and commons area, and (9) Campus Central Plant Chiller Upgrade.
Planning Estimate 1:
$ 10,275,000
Start Date:
August 22, 2008
End Date:
August 15, 2010
Photo Gallery:
Aerial Photos
Construction Photos
Architectural Photos - May 2011
Architect:
Chumney & Associates
General Contractor:
G.W. Mitchell & Sons, Inc.
G.W. Mitchell & Sons, Inc.
Project Summary:
Property Map (PDF)
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Architectural Renderings (PDF)
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.