2003 Project: Colonial Hills Elementary School (Classroom Addition)

28 New Classrooms, covered walkway connecting the gym to the academic building, and fire lane extension to create parent drop-off / pick-up lane with a covered walkway for student unloading/loading at the rear
Planning Estimate1:
Start Date:
May 2005
End Date:
July 2006
Photo Gallery:
General Contractor:
Greco Construction Co.

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.