2003 Bond Project:
Colonial Hills ES
Classroom Additions
Scope: |
28 New Classrooms, covered walkway connecting the gym to the academic building, and fire lane extension to create parent drop-off / pick-up lane with a covered walkway for student unloading/loading at the rear |
Planning Estimate 1: |
$ 5,140,000 |
Start Date: |
May 2005 |
End Date: |
July 2006 |
Photo Gallery: |
Aerial Photos |
Architect: |
McChesney Architects |
General Contractor: |
Greco Construction Co. |
Project Summary: |
Bid Award Agenda Item (PDF) Bid Tab (PDF) Project Summary (PDF) Site Plan (PDF) Floor Plans (PDF) |