information for the community

2011 Bond Project
Coker Elementary School Classroom Addition


Project Details
Scope:
The design provides for construction of: (1) twenty new classrooms, including 16 general purpose classrooms with integrated restrooms, two ALE Classrooms with an ALE Restroom, and two renovated existing classrooms; (2) library and media center; (3) computer lab; (4) new Administrative Office Suite; (5) teacher resource and support areas; (6) covered walkways at the parent drop-off/pick-up area and bus loading/unloading area; (7) fire lane extension; (8) central plant expansion for the new classroom/library addition; (9) renovations to the existing administrative and library areas into counseling and central teacher workroom; and (10) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new facility addition. The total facility program equals 43,128 sq. ft. for the new Classroom / library / administrative addition and 6,680 sq. ft. for the campus interior renovations program.
Planning Estimate 1:
$ 15,250,000
Start Date:
March 2014
End Date:
December 2015
Photo Gallery:
Aerial Photos
Architect:
DeMunbrun Scarnato Associates
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke
Project Summary
PDF format):

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.