2007 Bond Project: Churchill High School
Athletic Facility


Project Completed
Project Details
Scope:
Phased construction project which includes: (1) construction of a new soccer field in the vicinity of the temporary southwest parking lot area, (2) construction of a new athletic facility located at the existing soccer field area, (3) construction of four tennis courts along the southern campus boundary, (4) relocation of the shot put and discus throw areas, (5) construction of an outdoor athletic storage building, concession stands area and public restrooms, and (6) demolition of the existing athletic facility and replacement with parking, (7) the existing baseball field be reoriented into a proper north-north east direction which better serves the location of the new soccer field and provides for additional campus parking and (8) a new water-cooled central plant be constructed along the western campus boundary to immediately serve the majority of the existing campus facilities as well as the new athletic facility.
Planning Estimate 1:
$ 25,375,000
Start Date:
August 15, 2008
End Date:
August 1, 2011
Photo Gallery:
Aerial Photos
Construction Photos
Architectural Photos - November 2010
Architect:
Garza Bomberger & Associates
Garza Bomberger and Associates
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke, Inc.
Project Summary:
Property Map (PDF)
Bid Award Agenda Item (PDF)
Bid Tab (PDF)
Project Summary (PDF)
Architectural Renderings (PDF)
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.