2011 Bond Project
Camelot Elementary School
Classroom Addition
Scope: |
The design provides for construction of: (1) eighteen new classrooms, including 16 general purpose classrooms with integrated restrooms, and two ALE Classrooms with an ALE Restroom; (2) music classroom, office, and storage area; (3) library and media center; (4) computer lab; (5) new administrative, counseling, and clinic areas; (6) teacher resource and support areas; (7) covered walkways at the parent drop-off/pick-up area and bus loading/unloading area; (8) fire lane extension; (9) central plant expansion for the new classroom/library addition; (10) renovation of the existing administrative area into a central teacher workroom and family specialist program support area; (11) enclose the existing entry breezeway to create an interior connection between the existing campus classroom building and cafeteria; and (12) landscaping, irrigation, drainage, site utilities, and infrastructure improvements to complement the new facility addition. The total facility program equals 47,500 sq. ft. for the new classroom/library/admin. facility addition and 5,085 sq. ft. for the campus interior renovations program. |
Planning Estimate 1: |
$ 15,250,000 |
Start Date: |
February 2014 |
End Date: |
November 2015 |
Photo Gallery: |
Aerial Photos |
Architect: |
O'Connell Robertson |
General Contractor: |
TBA |
Project Summary: |
Schematic Design Presentation (PDF) Schematic Design Approval (PDF) |
1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs.