information for the community

2003 Bond Project: Bradley Middle School
Science Addition


Project Completed
Project Details
Scope:
Science Lab Facility: 8 Science Labs, 1 Centralized Chemical Storage Area, 3 Preparatory Storage Areas (1 adjacent to each Grade-Level), 2 Faculty Restrooms Upgraded, Science Department Offices (1 Office 1 Workroom), Safety Equipment integrated in Labs and Prep Areas, Connect New One-Story Prototype Facility to existing Facilities through a Covered Walkway.
Planning Estimate 1:
$ 4,675,362
Start Date:
January 2006
End Date:
December 2007
Photo Gallery:
Aerial Photos
Architect:
O'Neill Conrad Oppelt Architects, Inc.
O'Neill Conrad Oppelt Architects, Inc.
Architect:
Garza Bomberger & Associates
Garza Bomberger and Associates
General Contractor:
Bartlett Cocke General Contractors
Bartlett Cocke
Project Summary:
Bid Award Agenda Item
Bid Tab
Project Summary
Architectural Renderings
Site Plan (PDF)
Floor Plans (PDF)

1 The Bond Planning Estimate represents the original bond program costs developed during the bond planning meetings (November 2006 through February 2007) for each project and includes: Design Fees, Construction Costs, Technology Equipment and Installation, Furniture, Fixtures & Equipment and Construction Management Costs. The School Board "approved" construction budget can be found in the project Bid Award Agenda Item and represents any/all changes to the project resulting from the design development process and/or construction marketplace and inflation costs. Current Program Costs for each project are summarized in the 2007 Bond Budget Report.